2.0.3.0 

 Enhancement

1. Work done to handle case of rounding, while drum calculation in case of Cable Industry module is installed. 

2.0.2.0 

 Enhancement

1. Work done on Master Demand create lines from, consider SO Qty from Production Order.

1.1.28.0 

 Enhancement

1. Revert changes for Component qty calculation on Production Order. 

1.1.27.0 

 Enhancement

1. Done change for Any Drum calculation cases and corrected PO comp qty and Requisition qty. 

1.1.26.0

 Enhancment

1.Done change to calculate PO Component per unit qty precision. 

2.Done changes to calculate any drum values on PO 

3.Done change to calculate PO Component total qty using new formula. 

1.1.25.0

 Enhancement

1.Done change to get correct drum details with extra length. 

2.Done change for AnyDrum calculation for 1 and 2 No Of Drums. 

3. Done change for LastDrum calculation in case 1 No of drum  to exclude anylength. 

4. Done changes to calculate drum details on Production Order. 

1.1.24.0

 Enhancement

1.Done changes to set No of Consolidated lines value on Production Order. 

2.Done changes to calculate extra length operation wise on implement plan 

3.Done changes to set PO qty and drum details on Production Order 

4. Done changes to add any length for all duplicate components and change formula for PO drum calculation 

1.1.23.0

 Enhancement

1.Done changes for Implement plan for quantity calculation operation wise. 

2.Done changes for Implement plan to calculate extra length operation wise and resolved issue as extra length was not calculating when we run plan for the multiple time. 

3.Done changes to set Consolidate No Of Drums while creating Production Order. 

4. Done changes to set total qty on Production Order Component. 

1.1.20.0

 Enhancement

1.Done change in query for consolidated PO creation and set drum details on work order for finished good. 

2.Done changes for Implement plan for quantity calculation. 

3.Work done on code optimization for better security on callouts.

1.1.19.0

 Enhancement

1.Done changes on Implement Plan for consolidated PO creation and set drum details on PO Components  

2.Done changes on Production Order to calculate total qty including extra length for duplicate components. 

1.1.18.0

 Enhancement

1.Done changes on extra length calculation for duplicate components on Implement plan. 

2. Work done on extra length calculation for duplicate components on Production Order. 

1.1.16.0

 Enhancement

1.Done change to check PO reference on Production time ticket is processed or not, if not then give error msg completion on Production Order  

2.Revert changes for Extra length calculation on implement plan and set total qty on PO 

1.1.15.0

 Enhancement

1. Done changes to set Total Extra Length and PO qty on Production Order. 

2. Done change on Before save logic on Work order transaction line under Production Execution 

1.1.14.0

 Enhancement

1. Work done to update total qty for existing record on Production Order. 

1.1.13.0

 Enhancement

1. Done changes to create duplicate components for same product while creating Production Order from Implement plan. 

2. Commented code which were adding components Extra length details while calculation FD,AD and LD quantity. 

3.Refresh grid on focus after resize. 

4. Done change to set PO Qty and Total Qty on Production Order. 

1.1.12.0

 Enhancement

1. Done changes to set First drum, Any drum and Last drum qty calculation based on UOM precision on run plan process, Implement plan form and create work order class. 

2.Worked on round up decimal values based on UOM precision for First drum, Any drum and Last drum fields on run plan process, Implement plan form and create work order class. 

1.1.11.0

 Enhancement

1. Done changes to set qty on Implement plan form and Total Qty calculation on Component tab under PO on the basis of Round to upper column on UOM window. 

2.Work done to set Product version on PO for SFGs. 

1.1.10.0

 Enhancement

1. Calculation of total qty on Work Order Component and add extra length details from routing (Specific to Cable Industry module). 

2.Changes to round off qty in Implement plan form. 

3.Work done to calculate qty for implement plan form. 

4.Set Locator on PO from Component tab under Master Demand.

1.1.8.0

 Enhancement

1. Done Changes to calculate extra length from routing and set qty on Run MRP. 

2.Work done to get BOM Components on Run MRP based on BOM selected on Master Demand Components. 

1.1.7.0

 Enhancement

1. Change Constraint Type to Restrict of VAMRP_MasterDemand_ID under MD Line tab.

2.Done Changes to set SO Line Qty from forecast window on Master Demand. 

1.1.6.0

 Enhancement

1. Window:Plan>> Tab:Plan>> Table:VAMRP_Plan: 

New Columns/Fields added(Trx Organisation,Activity,Campaign,Project,User List 1,User List 2) 

2. Window:Master Demand>> Tab:Master Demand Line>> Table:Master Demand Line: 

New Columns/Fields added(Trx Organisation,Activity,Campaign,Project,User List 1,User List 2) 

3.Window:Forecast>> Tab:Line>> Table:ForecastLine:

New Columns/Fields added(Trx Organisation,Activity,Campaign,Project,User List 1,User List 2) 

4. Added Reference Order Line Column on VAMRP_Order_Audit, VAMRP_WorkOrder_Audit, VAMRP_Requisition_Audit, VAMRP_PlannedReceipt Tables. 

5.Work done on Implement Plan form point to check for SO Line Qty. 

6.Work done on Implement Plan form point to set test length details on Production Order while creating PO from Master demand window. 

7.Added callout to set BOM on Forecast line. 

8.Added check to run Copy production requirement process on freeze button on Master demand window 

9.Added Org Trx while creating lines from SO. 

10.Work done for implement plan form and add quantity parameters. 

11.Added Parent Product field in grid on Implement Plan form 

1.1.3.0

 Bug Resolved

Bug Fixes